Consulting and technical assistance for shipowners, ports and maritime players.

+33 9 84 04 82 84

310 rue Paradis, 13008 Marseille

info@alwenashipping.com

studies for the implementation of a towing assistance service

PRESENTATION OF THE PROJECT

In collaboration with See’Up, Technical, economic and financial studies for the implementation of a towing assistance service at Bastia’s commercial port.

 

Since May 2021, a decree has imposed the closure of the port if an average wind speed of between 30 and 45 knots is recorded (depending on wind components). This measure follows the grounding of the Corsica Linea ship Paglia Orba in January 2021, on the shoal at the entrance to the port.

In order to prevent such an accident from happening again, the Corsican Chamber of Commerce and Industry, in its capacity as concession holder and operator, has launched a public tender to study the conditions for implementing a port-of-call assistance service at Bastia’s commercial port.

With these studies, the Port de Commerce de Bastia and the CCI wanted to :

  • conduct a study to ascertain whether current towing and assistance capacity is sufficient to cope with changing weather and traffic conditions in the area
  • Should current capacity prove limited, identify the residual need and specify the characteristics of a towing service to meet it.
  • For any new tug planned, specify towing and assistance capacities, as well as the deployment of anti-pollution and fire-fighting resources.
  • Specify how such a vessel would be managed (and financed).
  • Support in preparing a call for tenders to acquire the specified vessel and implement the service
Category

Technical consulting

CLIENT : CCI Bastia Haute Corse

PARTENAIRE : See’Up

LANCEMENT DU PROJET : 11-2022
LIVRAISON DU PROJET : 04-2023

OUR MISSIONS

A context analysis: a series of interviews with all stakeholders in the port community, analysis of various studies and data, and definition of critical maneuvering conditions

Maneuvering simulator testing of port entry and exit conditions, with and without tugboat, on either side of the defined limits

Definition of the main elements to be included in a CCTP for the acquisition of a tugboat (port performance, versatility of use)

Proposal of concrete elements for a financial and legal study of the operation of a new means of transport

Any questions about this project ?

We're here to help.
Contact us for any information you may require.

Similar projects

electrification-quai-02 (1)
Shore power connection
Installation of shore power connection for Roro and passenger ships
alwenashipping-parl-06
Study of the potential for reducing greenhouse gas emissions
Study of the potential for reducing greenhouse gas emissions from ships based in and calling
alwena-shipping-pil-01
Technical specification review
Complete technical specification review of new 14000Evp Dual Fuel LNG and 8000 EVP Dual Fuel LNG vessels
niolon-alwena-shipping-01
Remotorization study
New propulsion Study for a RoRo
cerulean
Cerulean
Study of propulsion and electrical generation systems
alwena-shipping-cleancarriers-02
Containership study
23000 TEU containership study
lng-alwena-shipping-01
Technical inspection
Technical inspection of 6 gas carriers
mer-rouge-02
Study for the creation of a shiprepair yard
Study for a potential creation of a shiprepair yard in Red Sea area
alwena-shopping-stm-02
Tender technical assistance
Tender technical assistance for a small tanker